Overhead crane machine inspection is one of the most important and sometimes overlooked aspect of being an owner and/or operator of an overhead crane system. The Occupational Health and Safety Act and CMAA regulations recommend having an overhead crane inspected at least once a year, depending on the usage of the overhead crane. Cranes that have logged more hours and more shifts require inspection more often.
So what does an overhead crane inspection entail?
With every inspection Dongqi Electric technicians perform, a list of fundamental procedures are followed, such as:

  • Full lubrication of all required components
  • Inspection of bolted and welded connections
  • Minor adjustments to both electrical and mechanical components, including but not limited to: limit switches, control systems, brakes and trolley flange.
  • Operational tests through full range of functions

In addition to our main inspection, Dongqi Electric can also provide customers with a detailed inspection report, along with a summary of any issues that need to be addressed as well as any recommendations for repairs and maintenance requirements.

Upon request, Dongqi Electric can provide engineered stamped inspections, which include inspection of the structural steel support columns, runways and crane corbels and haunches. Also included are weight loading calculations and confirmations as well as detailed stamped engineer inspection reports with summary of issues that need to be addressed.

https://www.craneskit.com/overhead-crane-inspection.html